IACS - International Association of Classification Societies ltd.
Search
search documents

RSS Feeds

Alert

Latest Alert:

21 May 2013: Q&A and Common Interpretations on 2. Oil Tanker CSR has been updated by IACS.

21 May 2013: Q&A and Common Interpretations on 1. Bulk Carrier CSR has been updated by IACS.

02 May 2013: CI-B 2 has been published

01 April 2013: Draft Harmonised Common Structural Rules (CSR), Technical Background (TB) docuemnts and Consequence Assessment (CA) reports have been released for industry review.

07 December 2012: Bulk Carrier CSR Consolidated edition (July 2012) with Corrigenda approved on 21 November 2012, published.

30 November 2012: TB Report for Draft Harmonised CSR has been released by IACS.

31 October 2012: Technical Background Rule Reference for Draft Harmonised Rules has been published.

29 October 2012: CI-B 1 has been published

19 October 2012: Rev.2 of Tanker CIPT-8, with an updated 'Background' section, has been published.

11 October 2012: Industry Presentation material has been uploaded.

By IACS CSR Secretariat.

view attachment  





11. Technical Background Documents for Oil Tanker CSR (version Jan 06)

Note:

  1. These TBs are published to improve the transparency of CSRs and increase the understanding of CSRs in the industry.
  2. The content of the TBs are not to be considered as requirements.
  3. These TBs cannot be used to avoid any requirements in CSRs, and in cases where these TBs deviates from the rules, the rules have precedence.
  4. These TBs provide the background for the first version (January 2006) of the CSRs, and are not subject to maintenance.
  5. 'Two IACS Documentation Packages for the IMO Goal-Based Standards (GBS) Pilot Project', dated 16 February 2007 and 31 Mar 2008 respectively, are posted on this web site. These papers were intended to assist IMO conduct a pilot trial application of Tier III (verification) of the GBS for oil tankers and bulk carriers.

Latest revisions

Documentation Package for the IMO GBS Pilot Panel

00 The enclosed reports were submitted to the IMO Pilot Panel for the pilot project on trial application of the GBS Tier III evaluation process using IACS CSRs.
pdf download pdf    

TB for Section 1

01 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 1 - Introduction
pdf download pdf    

TB for Section 2

02 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 2-Rule Principles
pdf download pdf    

TB for Section 3

03 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 3-Rule Application
pdf download pdf    

TB for Section 4

04 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 4-Basic Information
pdf download pdf    

TB for Section 5

05 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 5-Structural Arrangement
pdf download pdf    

TB for Section 6

06 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 6-Material and Welding
pdf download pdf    

TB for Section 7

07 IACS CSR for Double Hull Oil Tankers January 2006 Background Documents. Section 7- Loads
pdf download pdf    

TB for Section 8/1

08/1 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents, Section 8/1- Scantling Requirements Longitudinal Strength.
pdf download pdf    

TB for Section 8/2

08/2 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents, Section 8/2- Scantling requirements Cargo Tank regions
pdf download pdf    

TB for Section 8/3

08/3 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents, Section 8/3- Scantling Requirements Structure forward of the forward Cargo Tank
pdf download pdf    

TB for Section 8/4

08/4 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 8/4- Scantling Requirements Machinery Space
pdf download pdf    

TB for Section 8/5

08/5 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 8/5- Scantling Requirements AFT END
pdf download pdf    

TB for Section 8/6

08/6 IACS CSR for Double Hull oil Tankers, January 2006, Background Documents Section 8/6- Scantling Requirements Evaluation of Structure for Sloshing and Impact Loads
pdf download pdf    

TB for Section 8/7

08/7 IACS CSR for Double Hull oil Tankers, January 2006. Background Documents, Section 8/7- Scantling Requirements Application of Scantling requirements to other Structure
pdf download pdf    

TB for Section 9/1

09/1 IACS CSR for Double Hull oil Tankers January 2006. Background Documents Section 9/1- Design Verification Hull Girder Ultimate Strength
pdf download pdf    

TB for Section 9/2

09/2 IACS CSR for Double Hull oil Tankers January 2006. Background Documents,Section 9/2- Design Verification Strength Assessment (FEM)
pdf download pdf    

TB for Section 9/3

09/3 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 9/3- Design Verification Fatigue Strength
pdf download pdf    

TB for Section 10

10 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 10- Buckling Ultimate Strength
pdf download pdf    

TB for Section 11

11 IACS CSR for Double hull oil Tankers January 2006. Background Documents, Section 11- General requirements
pdf download pdf    
  1/2