11. Technical Background Documents for Oil Tanker CSR (version Jan 06)

Note:

  1. These TBs are published to improve the transparency of CSRs and increase the understanding of CSRs in the industry.
  2. The content of the TBs are not to be considered as requirements.
  3. These TBs cannot be used to avoid any requirements in CSRs, and in cases where these TBs deviates from the rules, the rules have precedence.
  4. These TBs provide the background for the first version (January 2006) of the CSRs, and are not subject to maintenance.
  5. 'Two IACS Documentation Packages for the IMO Goal-Based Standards (GBS) Pilot Project', dated 16 February 2007 and 31 Mar 2008 respectively, are posted on this web site. These papers were intended to assist IMO conduct a pilot trial application of Tier III (verification) of the GBS for oil tankers and bulk carriers.

Documentation Package for the IMO GBS Pilot Panel

00 The enclosed reports were submitted to the IMO Pilot Panel for the pilot project on trial application of the GBS Tier III evaluation process using IACS CSRs.

TB for Section 1

01 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 1 - Introduction

TB for Section 2

02 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 2-Rule Principles

TB for Section 3

03 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 3-Rule Application

TB for Section 4

04 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 4-Basic Information

TB for Section 5

05 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 5-Structural Arrangement

TB for Section 6

06 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents Section 6-Material and Welding

TB for Section 7

07 IACS CSR for Double Hull Oil Tankers January 2006 Background Documents. Section 7- Loads

TB for Section 8/1

08/1 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents, Section 8/1- Scantling Requirements Longitudinal Strength.

TB for Section 8/2

08/2 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents, Section 8/2- Scantling requirements Cargo Tank regions

TB for Section 8/3

08/3 IACS CSR for Double Hull Oil Tankers January 2006. Background Documents, Section 8/3- Scantling Requirements Structure forward of the forward Cargo Tank

TB for Section 8/4

08/4 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 8/4- Scantling Requirements Machinery Space

TB for Section 8/5

08/5 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 8/5- Scantling Requirements AFT END

TB for Section 8/6

08/6 IACS CSR for Double Hull oil Tankers, January 2006, Background Documents Section 8/6- Scantling Requirements Evaluation of Structure for Sloshing and Impact Loads

TB for Section 8/7

08/7 IACS CSR for Double Hull oil Tankers, January 2006. Background Documents, Section 8/7- Scantling Requirements Application of Scantling requirements to other Structure

TB for Section 9/1

09/1 IACS CSR for Double Hull oil Tankers January 2006. Background Documents Section 9/1- Design Verification Hull Girder Ultimate Strength

TB for Section 9/2

09/2 IACS CSR for Double Hull oil Tankers January 2006. Background Documents,Section 9/2- Design Verification Strength Assessment (FEM)

TB for Section 9/3

09/3 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 9/3- Design Verification Fatigue Strength

TB for Section 10

10 IACS CSR for Double Hull oil Tankers January 2006. Background Documents, Section 10- Buckling Ultimate Strength

TB for Section 11

11 IACS CSR for Double hull oil Tankers January 2006. Background Documents, Section 11- General requirements