UI FTP
Fire Test Procedure
UI FTP1 Deleted
UI FTP1 Adhesives used in A or B class divisions - Del Dec 2020
UI FTP2 New
UI FTP2 Pipe and duct penetrations - June 2000
UI FTP3 Rev2 CLN
UI FTP3 Fire door (FTP Code sub-section 5.3 and Annex 1, Part 3 -Test for “A”, “B” and “F” class divisions) Rev.2 July 2010
UI FTP4 Rev1 CLN
UI FTP4 Fire resistant windows on tankers (Appendix A.I to resolution A.754(18)) - Rev.1 August 2006 CLN
UI FTP5 New
UI FTP5 Testing and approval of “A” class divisions – fastening of insulation material and details of joints (IMO Res. A.754(18) / IMO FTP Code Part 3) - June 2010
UI FTP6 Rev1 CLN
FTP6 Testing and approval of pipe penetrations and cable transits for use in “A” class divisions (IMO FTP Code 2010 Annex 1 Part 3) Rev.1 July 2015