38 Results
UI GC
Liquified Gases in Bulk
UI GC1 Deleted
UI GC1 Deleted
UI GC2 Rev1 CLN
UI GC2 Interpretation of the second sentence of paragraph 13.2.1 - Rev.1 Dec 2018 Clean
UI GC3 Deleted
UI GC3 Deleted 1997
UI GC4 Deleted
UI GC4 Deleted 1997
UI GC5 Rev1 CLN
UI GC5 Closing Devices for Air Intakes - Rev.1 February 2016
UI GC6 Rev1 CLN
UI GC6 Cargo tank clearances - Rev.1 Feb 2016
UI GC7 Rev1 CLN
UI GC7 Carriage of products not covered by the code - Rev.1 June 2016
UI GC8 Rev1 CLN
UI GC8 Permissible stresses in way of supports of type C cargo tanks - Rev.1 June 2016
UI GC9 Rev1 CLN
UI GC9 Guidance for sizing pressure relief systems for interbarrier spaces - Rev.1 Dec 2018 Clean
UI GC10 Rev1 CLN
UI GC10 Reliquefaction plant of moter-driven LNG-carriers - Rev.1 Dec 2018 Clean
UI GC11 Rev1 CLN
GC11 Loading of cargo C tanks for ships constructed before 1 July 2016 and subject to IMO International Code for the Construction and Equipment of Ships Carrying Liquefied Gases in Bulk (MSC.5(48)) Rev.1 Feb 2016
UI GC12 Rev2 CLN
GC12 Secondary barrier testing requirements Rev.2 Aug 2015
UI GC13 Rev2 CLN
UI GC13 Examination before and after the first loaded voyage - Rev.2 May 2019
UI GC14 New
UI GC14 Pump Vents in Machinery Spaces (IGC Code Chapters 3.7.4 as amended by Res. MSC. 103(73) and IGC Code Chapters 3.7.5 as amended by Res. MSC. 370(93)) - April 2015
UI GC15 Rev1 CLN
UI GC15 Closing Devices for Air Intakes - Rev1 August 2017
UI GC16 New
UI GC16 Cargo tank clearances (on ships constructed on or after 1 July 2016) - March 2016
UI GC17 New
UI GC17 Unprotected openings - June 2016
UI GC18 New Corr1 CLN
UI GC18 - Test for cargo tank’s high level alarm - Clean New Corr1 March 2017.
UI GC19 New
UI GC19 External surface area of the tank for determining sizing of pressure relief valve (paragraph 8.4.1.2 and figure 8.1) New Aug 2017.
38 Results